Run throughput, quality and cost from one plant view.

Offsight gives plant leaders one operating system for production, labor, materials, quality and cost so the plant review starts from facts, not reconstruction.

A plant manager reviewing the live floor board

Operational benefit

What Offsight gives this role.

  • A plant review that builds itselfOpen one board for the week’s throughput, labor, material use, quality and rework.
  • Cost tied to the unitLabor, material and rework stay attached to the product that incurred them.
  • Quality visible at the sourceFailed checks and quality trends surface from the zone where they happen.

Connected workflows

Where this role runs the work.

The Offsight screens that keep decisions connected to the floor.

Analytics — Dashboards · Console

Your own board of report cards.

Analytics — Labor · Console

Labor by Zone, Labor by User, Efficiency, Capacity and Rework, built on real clock-ins rather than an allocation.

Costing · Console

Production plans and material plans joined into one cost workspace.

Production — History · Both

Every completed unit with total time against target, the per-zone time logs behind it, the QC submissions attached, and a report you can export for one product.

A day of the labor schedule on iPhone

Offsight AI

Ask the plant review question and get the supporting facts.

Mission Control connects live production, labor, materials, quality and cost data.
  • Explains the variance. “Why was cost per unit up last week?” returns the zones, the hours and the rework that moved it, with the products named.
  • Builds the review before the review. Weekly and monthly plant reviews as PDF or XLSX, generated from the same data the floor is running on rather than re-keyed out of it.
  • Follows you onto the floor. The Offsight AI Assistant floats on every console screen and on the phone in your pocket.
  • Alerts do the watching. A failed check or a zone past target raises an alert on its own, and a standing plant report can email itself daily, weekly or monthly.
Total unit cost across the Offsight build programme
  1. 1ReadsProduction, materials, labor, quality and documents as one system
  2. 2SpotsSchedule risk, shortages, failed checks and bottlenecks early
  3. 3ActsUpdates the record, assigns follow-up and keeps teams aligned
  4. 4ReportsA clear record of actions, owners and next steps

Review ready

Weekly plant performance assembled from live data

True unit cost

Labor, materials and rework attach to the product that used them

One operating system

Production, labor, materials, quality and cost reconciled in one view

See Offsight from the plant manager’s seat.

We will run the demo around your products, your terminology and the daily workflows this role owns.

All roles