Skip to content
OffsightAI
Sign In

Solutions · Finance Director

See cost per unit while work is happening.

Offsight connects labor, materials, purchasing, production progress and rework so finance can see margin risk before close.

Checking production figures against the work on the floor

Operational benefit

What Offsight gives this role.

  • Close starts with live recordsHours, receipts, consumption and completed units are already tied to projects and products.
  • WIP tied to production statusPercent complete follows the production record instead of a weekly phone call.
  • Variance visible earlierLabor, materials and rework variance show up while work is still in progress.

Connected workflows

Where this role runs the work.

The Offsight screens that keep decisions connected to the floor.

Costing · Console

Where the estimate and the actual finally sit side by side.

Timesheets · Console

The same clock-ins the floor makes, rolled up five ways: Product Hours, Zone Hours, User Hours, Project Hours and the raw Clock Logs.

Purchase Orders · Both

Committed spend before it becomes an invoice, with the invoice state on the row.

Analytics — Production · Console

Total Unit Cost is the one you came for: what a unit actually cost to build, with a KPI row, a drill-down and XLSX export.

A scheduled order open on iPhone before it is sent to the floor

Offsight AI

Ask for the number and the reason behind it.

Mission Control reads production, labor, materials, purchasing and quality as one cost picture.
  • Explains the unit cost. “Why did this run cost more than the last one?” comes back as the zones, the hours and the material lines that differ, and it can open Total Unit Cost in Analytics.
  • Builds the close pack. Cost rollups, hours by project and consumption detail as PDF or XLSX, generated from the records the floor is running on.
  • Puts the variance on a cadence. Ask for a cost rollup by product type and have Offsight AI email it daily, weekly or monthly.
  • Answers on the spot. The floating Assistant sits on whatever screen you are on and can read it.
Offsight costing, real build cost per unit as it is produced
  1. 1ReadsProduction, materials, labor, quality and documents as one system
  2. 2SpotsSchedule risk, shortages, failed checks and bottlenecks early
  3. 3ActsUpdates the record, assigns follow-up and keeps teams aligned
  4. 4ReportsA clear record of actions, owners and next steps

Per-unit cost

Labor, materials, rework and scrap stay tied to the product that used them

Live WIP

Percent complete reads from production status

Less re-keying

Hours, receipts and consumption are captured as operational records

See Offsight from the finance director’s seat.

We will run the demo around your products, your terminology and the daily workflows this role owns.

All roles